Stockport's libraries have a £13m repair backlog. Hazel Grove Library faces months of closure for a new roof and heating, and Cheadle's roof is due in 2027.
Stockport’s library buildings need an estimated £13 million of repairs, the council says. Hazel Grove Library will close for an extended period for a new roof and heating system, and Cheadle Library’s roof is due to be replaced in 2027.
The figures are in a review of the borough’s libraries going to the council’s Communities and Transport Scrutiny Committee on Monday 23 November. The report also sets out a first year of more than a million visits at Stockroom, the new town-centre library in Merseyway.
Overview
- The library estate has an estimated £13 million “condition backlog”.
- Hazel Grove Library: new heating system and full roof replacement, with work between November 2026 and summer 2027.
- Cheadle Library: water has come in, making some public areas unusable. The roof is due to be replaced in 2027.
- Both buildings will close for “extended periods”. The council says it will arrange other staffed library services locally.
- Reddish and Offerton: the council will ask residents from January 2027 what they need from their libraries.
The three libraries with problems now
The report names three libraries where the state of the building is already affecting the service.
- Hazel Grove Library needs a replacement heating system and a full roof replacement. Work between November 2026 and summer 2027 will also include measures to cut the building’s carbon emissions.
- Cheadle Library has had “significant water ingress, making some public areas unusable”. Its roof replacement is planned for 2027.
- Reddish Library “continues to be affected by structural problems with a neighbouring building”.
The report says limited investment over many years led to the backlog. It warns that ageing buildings raise the risk of “unplanned closures” and that relying on short-term repairs “is not sustainable in the longer term”.
The council has not yet published closure dates for Hazel Grove or Cheadle. Its libraries page says some libraries “may be affected by temporary building works” and that it will explain any changes.
Reddish and Offerton
The position at Reddish is described as “more complex”, because the problems come from neighbouring buildings in poor condition. From January 2027 the council will work with residents and library users in Reddish to “explore the options available”.
Offerton Library and Great Moor Library both serve the Offerton ward. They have the lowest use of the permanent neighbourhood libraries. Offerton had 9,095 visits in 2025/26 and Great Moor 13,583. Residents there will also be asked from January what they need and “what may be limiting participation”.
The report does not propose closing any library.
How busy each library is
Bramhall was the busiest neighbourhood library in 2025/26, with 47,522 visits. Offerton was the quietest permanent one.
The report marks visits as rising at Bramhall, Cheadle Hulme, Adswood and Bridgehall, and Great Moor. They fell at the Heatons, Bredbury, Edgeley, Reddish, High Lane and Offerton. Marple’s figure is for its temporary library; before it closed, Marple Library had more than 50,000 visits a year.
Stockroom’s first year
Stockroom replaced the town-centre service at Central Library. The report compares its first year, June 2025 to May 2026, with Central Library’s last comparable year:
| Measure | Central Library, June 2023 to May 2024 | Stockroom, June 2025 to May 2026 |
|---|---|---|
| Visits | 79,141 | 1,085,451 |
| Book loans | 34,437 | 62,664 |
| New library members | 1,440 | 3,702 |
| Public computer use | 19,593 hours | 20,155 hours |
| Opening hours | 51 a week | 53 a week |
Of 645 people who answered a visitor survey, 94.9% rated Stockroom four or five out of five. The council says the survey is “indicative rather than fully representative”.
A £175,000 Greater Manchester Live Well grant will extend Stockroom into unused space, adding quiet areas, meeting rooms and space for one-to-one support.
The report is frank about the costs of that success. Staffing seven days a week, with three late nights, is “particularly challenging”. Heavy use adds to cleaning, security and wear and tear, and opening hours have been changed to put staff where they are busiest.
The old Central Library building on Wellington Road South is closed. The council wants it to become the home of the Stockport Music Service, but that depends on finding money for the repairs.
The money
Since 2010/11 the library service has saved £1.2 million, 31% of its original budget, while keeping the same number of sites. Its yearly running budget is now £2.6 million.
The report says “difficult choices will be needed” about how to use the money available. A new strategy, Libraries 2030, will be drawn up with residents from early 2027. Its draft principles say every community should have “access to a good-quality library service shaped around local need”, but not that every library will look the same.
Marple’s new library opens inside the Marple Hub on Friday 11 December.
What it means for you
If you use Hazel Grove or Cheadle library, expect each to close for months at some point between now and the end of 2027. No dates have been given yet.
If you live in Reddish or Offerton, you will be asked what you want from your library from January 2027. The council has not yet said how.
Scrutiny councillors discuss the report at 6pm on Monday 23 November. The meeting is public and the papers are on the council’s meetings site.